Whats the helicopter capability of LE eithne?
I mean, if the current tender for LUH and UH are not naval capable as expected, and the future tender for MLH is designed for a future bigger ship, then is the helicopter capability of the LE eithne now going to be wasted?
would it be able to accomodate any likely MLH?
does the navy really care given the curreny operations undertaken?
in recent times, are the dauphins routinely dispatched on the LE Eithne?